Owner: Pine Crest Preparatory School
Contract Type: CM @ Risk
Size: 40,000 sq. ft.
Description: This was a two phase project Phase one was new construction next to existing school on tight site with active and fully occupied campus. The new construction included classrooms, cafeteria, parking lot, drainage system and site work. Phase two included renovations to existing school included cafeteria, dining hall and classrooms. Created Maintenance of Traffic plan and smoothly redirected student drop-off and pick-up for 700+ students.
Testimonial: “Kaufman Lynn’s past performance with Pine Crest Preparatory School projects have shown their abilities to provide quality construction, as well as an excellent ability to work within the physical constraints of a school campus to assure parent, faculty and student safety at all times while executing a construction project in an aggressive construction schedule.”
Neyda Otera
Director of Project Management
Pine Crest Preparatory School
|
|